(TOD™) Tests of Dyslexia Manual
Comparison chart of all Tests of Dyslexia Kits and their components. See which kit fits your specific needs!
(TOD®) Tests of Dyslexia
(TOD™) Tests of Dyslexia Combination Kit
(TOD™) Tests of Dyslexia Screener Kit
(TOD™) Tests of Dyslexia Early Kit
(TOD™) Tests of Dyslexia Comprehensive Kit
Sample Materials Available!

(TOD®) Tests of Dyslexia

by Nancy Mather, PhD, R. Steve McCallum, PhD, Sherry Mee Bell, PhD, Barbara J. Wendling, MA
Norms
2,518 individuals aged 5 to 89 in standardization and validation studies. Standardization sample closely matches U.S. Census data for gender, race/ethnicity, parents’ educational level, and geographic area
Benefit
Allows practitioners and educators to accurately assess and diagnose dyslexia and specific learning disability in reading, provides risk and probability indexes, and includes intervention recommendations based on assessment results
Audio File

Available for download here.

Scores
Standard and composite scores, percentile ranks, confidence intervals, age- and grade-equivalents; growth scores for monitoring progress. TOD Rating Scales provide T-scores, percentiles, confidence intervals, and level of risk. See full scores below.
Format
TOD-S can be administered to individuals or groups; TOD-C and TOD-E are individually administered; available in digital or paper formats
Admin Time
TOD-S: 10–15 minutes; TOD-E: additional 20–25 minutes after TOD-S; TOD-C: additional 30–40 minutes after TOD-S to obtain DDI, LPI, and RSI with additional tests at 5-10 minutes each
Ages
Grade K through adulthood; ages 5 years, 0 months–89 years, 11 months
Publish Date
2024
Qualifications
Level B required

About Qualification Levels

Please  log in  to download sample materials
Have a question? CALL 800.648.8857

(TOD®) Tests of Dyslexia

From $15.00

To $7,979.00

In stock

SKU
tod-tests-of-dyslexia

Download Sample Materials

to download sample materials.

Don't have an account?

Customize (TOD®) Tests of Dyslexia
Kit
TOD Print Combination Kit
SKU: W-705

Print components

  • TOD Manual
  • TOD Norms
  • Dyslexia Interventions and Recommendations: A Companion Guide to the Tests of Dyslexia (TOD)
  • TOD-S Administration Guide

Easels:

  • TOD-C Easels 1 and 2
  • TOD-E Easel

Response Booklets and Forms (Pack of 10):

  • TOD-S Response Booklet and Scoring Sheet Grades K–1 (2 Packs of 10)*
  • TOD-S Response Booklet and Scoring Sheet Grades 2–5 (2 Packs of 10)*
  • TOD-S Response Booklet and Scoring Sheet Grade 6–Adult*
  • TOD-E Record Form Grades K–2*
  • TOD-C Response Booklet Grade 1–Adult
  • TOD-C Record Form Grade 1–Adult*

*Online scoring included

 

Online Evaluation System (OES)

Digital components

  • TOD Manual
  • TOD Norms

Online Rating Forms (10 uses of each):

  • TOD-E Teacher
  • TOD-E Parent/Caregiver
  • TOD-C Teacher
  • TOD-C Self
  • TOD-C Parent/Caregiver

Canvas carrying bag included

 

Show More
1 x TOD Print Combination Kit   + $1,491.00
Kit
TOD-C Comprehensive Kit
SKU: W-700

Print components

  • TOD Manual
  • TOD Norms
  • Dyslexia Interventions and Recommendations: A Companion Guide to the Tests of Dyslexia (TOD)
  • TOD-S Administration Guide

Easels:

  • TOD-C Easels 1 and 2

Response Booklets and Forms (Pack of 10):

  • TOD-S Response Booklet and Scoring Sheet Grades K–1*
  • TOD-S Response Booklet and Scoring Sheet Grades 2–5*
  • TOD-S Response Booklet and Scoring Sheet Grade 6–Adult*
  • TOD-C Response Booklet Grade 1–Adult
  • TOD-C Record Form Grade 1–Adult*

*Online scoring included

 

Online Evaluation System (OES)

Online Rating Forms (10 uses of each):

  • TOD-C Teacher
  • TOD-C Self
  • TOD-C Parent/Caregiver

Canvas carrying bag included

 

Show More
1 x TOD-C Comprehensive Kit   + $933.00
Kit
TOD-S Print Screener Kit
SKU: W-701

Print components

  • TOD Manual
  • TOD Norms
  • Dyslexia Interventions and Recommendations: A Companion Guide to the Tests of Dyslexia (TOD)
  • TOD-S Administration Guide

Response Booklets and Forms (Pack of 10):

  • TOD-S Response Booklet and Scoring Sheet Grades K–1*
  • TOD-S Response Booklet and Scoring Sheet Grades 2–5*
  • TOD-S Response Booklet and Scoring Sheet Grade 6–Adult*

*Online scoring included

Canvas carrying bag included

Show More
1 x TOD-S Print Screener Kit   + $460.00
Kit
TOD-S Online Screener Kit
SKU: W-701P
 

Online Evaluation System (OES)

Digital components

  • TOD Manual
  • TOD Norms
  • Dyslexia Interventions and Recommendations: A Companion Guide to the Tests of Dyslexia (TOD)
  • TOD-S Administration Guide

Online Response Booklets (10 uses of each):

  • TOD-S Response Booklet Grades K–1*
  • TOD-S Response Booklet Grades 2–5*
  • TOD-S Response Booklet Grade 6–Adult*

*Online scoring included

Show More
1 x TOD-S Online Screener Kit   + $442.00
Kit
TOD-E Early Kit
SKU: W-702

Print components

  • TOD Manual
  • TOD Norms
  • Dyslexia Interventions and Recommendations: A Companion Guide to the Tests of Dyslexia (TOD)
  • TOD-S Administration Guide

Easels:

  • TOD-E Easel

Response Booklets and Forms (Pack of 10):

  • TOD-S Response Booklet and Scoring Sheet Grades K–1*
  • TOD-S Response Booklet and Scoring Sheet Grades 2–5*
  • TOD-E Record Form Grades K–2*

*Online scoring included

 

Online Evaluation System (OES)

Online Rating Forms (10 uses of each):

  • TOD-E Teacher
  • TOD-E Parent/Caregiver

Canvas carrying bag included

 

Show More
1 x TOD-E Early Kit   + $678.00
Forms
TOD-C Print Response Booklet Grade 1-Adult (Pack of 10)
SKU: W-700A
1 x TOD-C Print Response Booklet Grade 1-Adult (Pack of 10)   + $44.00
Forms
TOD-C Print Record Form Grade 1-Adult (Pack of 10)
SKU: W-700B
1 x TOD-C Print Record Form Grade 1-Adult (Pack of 10)   + $44.00
Forms
TOD-C Online Teacher Rating Form (5 Uses)
SKU: W-700CP5
1 x TOD-C Online Teacher Rating Form (5 Uses)   + $25.00
Forms
TOD-C Online Teacher Rating Form (10 Uses)
SKU: W-700CP10
1 x TOD-C Online Teacher Rating Form (10 Uses)   + $50.00
Forms
TOD-C Online Self-Rating Form (5 Uses)
SKU: W-700DP5
1 x TOD-C Online Self-Rating Form (5 Uses)   + $25.00
Forms
TOD-C Online Self-Rating Form (10 Uses)
SKU: W-700DP10
1 x TOD-C Online Self-Rating Form (10 Uses)   + $50.00
Forms
TOD-C Online Parent/Caregiver Rating Form (5 Uses)
SKU: W-700EP5
1 x TOD-C Online Parent/Caregiver Rating Form (5 Uses)   + $25.00
Forms
TOD-C Online Parent/Caregiver Rating Form (10 Uses)
SKU: W-700EP10
1 x TOD-C Online Parent/Caregiver Rating Form (10 Uses)   + $50.00
Forms
TOD-C Online Spanish Parent/Caregiver Rating Form (5 Uses)
SKU: W-700FP5
1 x TOD-C Online Spanish Parent/Caregiver Rating Form (5 Uses)   + $25.00
Forms
TOD-C Online Spanish Parent/Caregiver Rating Form (10 Uses)
SKU: W-700FP10
1 x TOD-C Online Spanish Parent/Caregiver Rating Form (10 Uses)   + $50.00
Forms
TOD-S Print Response Booklet and Scoring Sheet Grades K-1 (Pack of 10)
SKU: W-701A
1 x TOD-S Print Response Booklet and Scoring Sheet Grades K-1 (Pack of 10)   + $44.00
Forms
TOD-S Online Response Booklet Grades K-1 (5 Uses)
SKU: W-701AP5
1 x TOD-S Online Response Booklet Grades K-1 (5 Uses)   + $25.00
Forms
TOD-S Online Response Booklet Grades K-1 (10 Uses)
SKU: W-701AP10
1 x TOD-S Online Response Booklet Grades K-1 (10 Uses)   + $50.00
Forms
TOD-S Print Response Booklet and Scoring Sheet Grades 2-5 (Pack of 10)
SKU: W-701B
1 x TOD-S Print Response Booklet and Scoring Sheet Grades 2-5 (Pack of 10)   + $44.00
Forms
TOD-S Online Response Booklet Grades 2-5 (5 Uses)
SKU: W-701BP5
1 x TOD-S Online Response Booklet Grades 2-5 (5 Uses)   + $25.00
Forms
TOD-S Online Response Booklet Grades 2-5 (10 Uses)
SKU: W-701BP10
1 x TOD-S Online Response Booklet Grades 2-5 (10 Uses)   + $50.00
Forms
TOD-S Print Response Booklet and Scoring Sheet Grade 6-Adult (Pack of 10)
SKU: W-701C
1 x TOD-S Print Response Booklet and Scoring Sheet Grade 6-Adult (Pack of 10)   + $44.00
Forms
TOD-S Online Response Booklet Grade 6-Adult (5 Uses)
SKU: W-701CP5
1 x TOD-S Online Response Booklet Grade 6-Adult (5 Uses)   + $25.00
Forms
TOD-S Online Response Booklet Grade 6-Adult (10 Uses)
SKU: W-701CP10
1 x TOD-S Online Response Booklet Grade 6-Adult (10 Uses)   + $50.00
Forms
TOD-E Print Record Form Grades K-2 (Pack of 10)
SKU: W-702A
1 x TOD-E Print Record Form Grades K-2 (Pack of 10)   + $44.00
Forms
TOD-E Online Teacher Rating Form (5 Uses)
SKU: W-702BP5
1 x TOD-E Online Teacher Rating Form (5 Uses)   + $25.00
Forms
TOD-E Online Teacher Rating Form (10 Uses)
SKU: W-702BP10
1 x TOD-E Online Teacher Rating Form (10 Uses)   + $50.00
Forms
TOD-E Online Parent/Caregiver Rating Form (5 Uses)
SKU: W-702CP5
1 x TOD-E Online Parent/Caregiver Rating Form (5 Uses)   + $25.00
Forms
TOD-E Online Parent/Caregiver Rating Form (10 Uses)
SKU: W-702CP10
1 x TOD-E Online Parent/Caregiver Rating Form (10 Uses)   + $50.00
Forms
TOD-E Online Spanish Parent/Caregiver Rating Form (5 Uses)
SKU: W-702DP5
1 x TOD-E Online Spanish Parent/Caregiver Rating Form (5 Uses)   + $25.00
Forms
TOD-E Online Spanish Parent/Caregiver Rating Form (10 Uses)
SKU: W-702DP10
1 x TOD-E Online Spanish Parent/Caregiver Rating Form (10 Uses)   + $50.00
Easel / Plates / Book / Other
TOD-C Print Easel 1
SKU: W-700G
1 x TOD-C Print Easel 1   + $130.00
Easel / Plates / Book / Other
TOD-C Digital Easel 1
SKU: W-700GP
1 x TOD-C Digital Easel 1   + $130.00
Easel / Plates / Book / Other
TOD-C Print Easel 2
SKU: W-700H
1 x TOD-C Print Easel 2   + $130.00
Easel / Plates / Book / Other
TOD-C Digital Easel 2
SKU: W-700HP
1 x TOD-C Digital Easel 2   + $130.00
Easel / Plates / Book / Other
TOD-E Print Easel
SKU: W-702E
1 x TOD-E Print Easel   + $130.00
Easel / Plates / Books / Other
TOD-E Digital Easel
SKU: W-702EP
1 x TOD-E Digital Easel   + $130.00
Manual
TOD Print Manual
SKU: W-700M
1 x TOD Print Manual   + $100.00
Manual
TOD Online Manual
SKU: W-700MP
1 x TOD Online Manual   + $100.00
Manual
TOD Print Norms
SKU: W-700N
1 x TOD Print Norms   + $125.00
Manual
TOD Online Norms
SKU: W-700NP
1 x TOD Online Norms   + $125.00
Manual
Dyslexia Interventions and Recommendations - A Print Companion Guide to the Tests of Dyslexia (TOD)
SKU: W-700J
1 x Dyslexia Interventions and Recommendations - A Print Companion Guide to the Tests of Dyslexia (TOD)   + $75.00
Manual
Dyslexia Interventions and Recommendations - An Online Companion Guide to the Tests of Dyslexia (TOD)
SKU: W-700JP
1 x Dyslexia Interventions and Recommendations - An Online Companion Guide to the Tests of Dyslexia (TOD)   + $75.00
Manual
TOD-S Print Administration Guide
SKU: W-701D
1 x TOD-S Print Administration Guide   + $15.00
Manual
TOD-S Online Administration Guide
SKU: W-701DP
1 x TOD-S Online Administration Guide   + $15.00
Forms
TOD-C Online Teacher Rating Form (5 Uses)
SKU: W-700CP5
1 x TOD-C Online Teacher Rating Form (5 Uses)   + $25.00
Forms
TOD-C Online Teacher Rating Form (10 Uses)
SKU: W-700CP10
1 x TOD-C Online Teacher Rating Form (10 Uses)   + $50.00
Forms
TOD-C Online Self-Rating Form (5 Uses)
SKU: W-700DP5
1 x TOD-C Online Self-Rating Form (5 Uses)   + $25.00
Forms
TOD-C Online Self-Rating Form (10 Uses)
SKU: W-700DP10
1 x TOD-C Online Self-Rating Form (10 Uses)   + $50.00
Forms
TOD-C Online Parent/Caregiver Rating Form (5 Uses)
SKU: W-700EP5
1 x TOD-C Online Parent/Caregiver Rating Form (5 Uses)   + $25.00
Forms
TOD-C Online Parent/Caregiver Rating Form (10 Uses)
SKU: W-700EP10
1 x TOD-C Online Parent/Caregiver Rating Form (10 Uses)   + $50.00
Forms
TOD-C Online Spanish Parent/Caregiver Rating Form (5 Uses)
SKU: W-700FP5
1 x TOD-C Online Spanish Parent/Caregiver Rating Form (5 Uses)   + $25.00
Forms
TOD-C Online Spanish Parent/Caregiver Rating Form (10 Uses)
SKU: W-700FP10
1 x TOD-C Online Spanish Parent/Caregiver Rating Form (10 Uses)   + $50.00
Forms
TOD-E Online Spanish Parent/Caregiver Rating Form (5 Uses)
SKU: W-702DP5
1 x TOD-E Online Spanish Parent/Caregiver Rating Form (5 Uses)   + $25.00
Forms
TOD-E Online Spanish Parent/Caregiver Rating Form (10 Uses)
SKU: W-702DP10
1 x TOD-E Online Spanish Parent/Caregiver Rating Form (10 Uses)   + $50.00
Forms
TOD-E Online Teacher Rating Form (5 Uses)
SKU: W-702BP5
1 x TOD-E Online Teacher Rating Form (5 Uses)   + $25.00
Forms
TOD-E Online Teacher Rating Form (10 Uses)
SKU: W-702BP10
1 x TOD-E Online Teacher Rating Form (10 Uses)   + $50.00
Forms
TOD-E Online Parent/Caregiver Rating Form (5 Uses)
SKU: W-702CP5
1 x TOD-E Online Parent/Caregiver Rating Form (5 Uses)   + $25.00
Forms
TOD-E Online Parent/Caregiver Rating Form (10 Uses)
SKU: W-702CP10
1 x TOD-E Online Parent/Caregiver Rating Form (10 Uses)   + $50.00
Manual
TOD Print Norms
SKU: W-700N
1 x TOD Print Norms   + $125.00
Manual
TOD Online Norms
SKU: W-700NP
1 x TOD Online Norms   + $125.00
Manual
Dyslexia Interventions and Recommendations - A Print Companion Guide to the Tests of Dyslexia (TOD)
SKU: W-700J
1 x Dyslexia Interventions and Recommendations - A Print Companion Guide to the Tests of Dyslexia (TOD)   + $75.00
Manual
Dyslexia Interventions and Recommendations - An Online Companion Guide to the Tests of Dyslexia (TOD)
SKU: W-700JP
1 x Dyslexia Interventions and Recommendations - An Online Companion Guide to the Tests of Dyslexia (TOD)   + $75.00
Training
TOD Training Video Program
SKU: LMS-705

Online self-study for learning for the Tests of Dyslexia. Includes online videos and associated digital support materials on the WPS Professional Learning Center (WPS ProLearn). (For CE credit, see Independent Study: TOD Training Video Program [LMS-705CE].)

CE sold separately.

1 x TOD Training Video Program   + $350.00
Continuing Education
Independent Study: TOD Training Video Program
SKU: LMS-705CE

Includes post-test materials available online on the WPS Professional Learning Center (WPS ProLearn). Purchase these post-test materials and complete them on the WPS ProLearn to receive 3 continuing education (CE) credits for mastering the content of the TOD Training Video Program (sold separately, LMS-705 on the WPS ProLearn). 

Video sold separately.

1 x Independent Study: TOD Training Video Program   + $54.00
Continuing Education
Independent Study: TOD Manual
SKU: LMS-700MCE

Includes post-test materials available online on the WPS Professional Learning Center (WPS ProLearn®). Purchase these post-test materials and complete them on the WPS ProLearn to receive 6 continuing education (CE) credits for mastering the content of the TOD Manual (sold separately, W-700M in print format or W-700MP in online format on the WPS Online Evaluation System).

Manual sold separately.

1 x Independent Study: TOD Manual   + $108.00
On-Demand Webinar: Using the Results of a Comprehensive Dyslexia Evaluation to Inform Instruction
SKU: LMS_PW_F_23
1 x On-Demand Webinar: Using the Results of a Comprehensive Dyslexia Evaluation to Inform Instruction   + $38.00
On-Demand Webinar: Linking TOD® Results to Interventions
SKU: LMS_PW_C_24

This on-demand webinar provides guidance in linking Tests of Dyslexia (TOD®) results to interventions. Barbara Wendling, MA, will explain how a TOD evaluation can inform instructional planning and help determine appropriate interventions to address the diverse needs of struggling readers. The principles of effective learning and instruction will be presented along with specific evidence-based interventions in phonemic awareness, phonics, orthography, and fluency.  

 

Learning Objectives  

At the end of this webinar, the learner will be able to:  

  • Describe the role of evaluation in preparing an informed instructional plan; 
  • Utilize TOD results to determine appropriate interventions; 
  • Explain the principles of effective learning and instruction; and 
  • Identify evidence-based interventions for key areas typically impaired for individuals with dyslexia. 
Show More
1 x On-Demand Webinar: Linking TOD® Results to Interventions   + $38.00
On-Demand Webinar: Taking a Deeper Dive Into Dyslexia: TOD® Case Studies
SKU: LMS_PW_G_24

Description of Webinar

The purpose of this webinar is to discuss important considerations in dyslexia assessment by reviewing several customer questions about dyslexia, as well as the Tests of Dyslexia (TOD®) results with individuals of varying ages (early elementary to adult). Example cases will focus on topics such as identification of early indicators of dyslexia and the need for systematic instruction; the importance of using a multiple deficit framework and assessing several linguistic risk factors; the challenges in distinguishing dyslexia from other disorders, such as dysgraphia, developmental language disorder, and ADHD; the importance of providing specific recommendations and including qualitative information to help support conclusions; and considerations when preparing a report to help a student get the accommodation of extended time on high-stakes tests. In addition, specific interpretive features of the TOD will be explained, including the use and interpretation of the Dyslexia Diagnostic Index.  


 

Learning Objectives

At the end of this webinar, the learner will be able to:

  • Identify the main linguistic risk factors that can contribute to problems in reading and spelling development; 
  • Explain the use and interpretation of the TOD Dyslexia Diagnostic Index; and  
  • Explain the importance of providing specific recommendations for accommodations and interventions. 
Show More
1 x On-Demand Webinar: Taking a Deeper Dive Into Dyslexia: TOD® Case Studies   + $38.00

* Required Fields

Your Customization
(TOD™) Tests of Dyslexia Manual
(TOD®) Tests of Dyslexia

In stock

$15.00

Summary

    About This Product

    Audio file for the TOD® is available for download here.

    Frequently asked questions (FAQs) about the TOD are available for reference.

    The Tests of Dyslexia (TOD®) consists of three (3) sets of direct assessments: TOD-Screener (TOD-S), TOD-Early (TOD-E), and TOD-Comprehensive (TOD-C). The tests measure skills and abilities across three domains: reading and spelling; linguistic processing; and vocabulary and reasoning. TOD Parent/Caregiver, Teacher, and Self-Rating Scales gather data on indicators of dyslexia such as family history of reading problems, motivation, and early speech or language difficulties.

    Together, the tests can help you create a profile of reading, spelling, and linguistic abilities to identify those who have characteristics consistent with a dyslexia diagnosis. The Dyslexia Interventions and Recommendations: A Companion Guide to the Tests of Dyslexia (TOD) links assessment data to evidence-based intervention recommendations so you can plan instruction based on individual strengths and needs.

    Expanded Scoring Information

    Age-based and grade-based standard scores, percentile ranks, confidence intervals, and age- and grade-equivalent scores for each TOD test; Dyslexia Risk Index (TOD-S); Early Dyslexia Diagnostic Index (TOD-E); Dyslexia Diagnostic Index (TOD-C); composite scores in the domains of reading and spelling, linguistic processing, and vocabulary and reasoning; growth scores for monitoring progress. Co-normed TOD Rating Scales provide T-scores, percentile ranks, confidence intervals, and level of risk.

    The TOD offers flexible testing configurations, standalone test options, as well as supplemental composites. The TOD-C generates 15 composite scores, and the TOD-E generates 4 composite scores, allowing practitioners to tailor each assessment to the needs of students.

     

    TOD-E_Composites TOD-C_Composites_1

     

     

    WPS includes online scoring for all TOD kits.

    Comprehensive Tests

    Decades of reading research have identified the linguistic skills that underlie reading and spelling abilities, as well as those that are typically affected by dyslexia. In alignment with that research, the TOD measures:

    • Sight Word Acquisition
    • Phonics Knowledge
    • Basic Reading Skill
    • Decoding Efficiency
    • Spelling
    • Reading Fluency
    • Reading Comprehension Efficiency
    • Phonological Awareness
    • Rapid Automatized Naming
    • Auditory Working Memory
    • Orthographic Processing
    • Visual–Verbal Paired-Associate Learning
    • Vocabulary
    • Reasoning

    TOD-Screener

    This quick screener can be used with individuals or groups to provide a Dyslexia Risk Index (DRI) to show whether a more comprehensive assessment is needed.

    TOD-S tests include:

    • Picture Vocabulary (not included in DRI)
    • Letter and Word Choice
    • Word or Question Reading Fluency 

    TOD-Comprehensive

    The TOD-C provides a comprehensive dyslexia assessment which yields a Dyslexia Diagnostic Index (DDI) indicating the probability that an individual has dyslexia. The DDI is based on 2 tests from the TOD-S and 6 additional tests from the TOD-C. Another 14 tests provide a detailed look at skills and abilities related to dyslexia.

    TOD-C tests include:

    • Phonological Manipulation
    • Irregular Word Spelling
    • Rapid Letter Naming
    • Pseudoword Reading
    • Word Pattern Choice
    • Word Memory
    • Picture Analogies
    • Irregular Word Reading
    • Oral Reading Efficiency
    • Blending
    • Segmenting
    • Regular Word Spelling
    • Silent Reading Efficiency
    • Rapid Number and Letter Naming
    • Letter Memory
    • Rapid Pseudoword Reading
    • Rapid Irregular Word Reading
    • Symbol to Sound Learning
    • Listening Vocabulary
    • Geometric Analogies

    TOD-Early

    The TOD-E assesses each of the early abilities that most clearly indicate dyslexia in young children, yielding an Early Dyslexia Diagnostic Index (EDDI) score. Two TOD-S tests, along with the 6 TOD-E tests, indicate an individual’s risk of dyslexia.  

    TOD-E tests include:

    • Sounds and Pseudowords
    • Rhyming
    • Early Rapid Number and Letter Naming
    • Letter and Sight Word Recognition
    • Early Segmenting
    • Letter and Sound Knowledge

    TOD Rating Scales

    TOD-C and TOD-E Parent/Caregiver Rating Scales for grades K through 12 (available in English and Spanish) provide information about:

    • family history of reading or spelling difficulties;
    • delays in early speech or language development;
    • the student’s ability to read, spell, listen, and speak;
    • impressions of the student’s abilities compared to others of the same age;
    • the student’s attitude toward reading; and
    • the amount of support needed for homework and organization.

    TOD-C and TOD-E Teacher Rating Scales provide information about:

    • the amount of difficulty a student has with reading, spelling, and other classroom tasks;
    • whether a student needs extra time to complete assignments;
    • how oral language and reasoning skills compare to those of peers; and
    • apparent preference for other activities over reading.

    TOD-C Self-Rating Scales for Grade 1 through adulthood provide information about:

    • attitude toward reading; and
    • perception of oral language, word reading, comprehension, and spelling abilities.

    Dyslexia Interventions and Recommendations: A Companion Guide to the Tests of Dyslexia (TOD)

    This practical, evidence-based companion guide (referred to as the TOD Intervention Guidebook) helps practitioners link detailed interventions and recommendations to assessment data. Based on a structured literacy approach, the guide contains hundreds of strategies and activities grounded in the Science of Reading. It can be used by teachers, clinicians, and families to focus instruction and create a more supportive, effective learning environment.

    Use With Variety of SLD Models

    The Individuals with Disabilities Education Act (IDEA) describes three methods for identifying dyslexia and other learning disabilities:   

    • Discrepancy between ability and achievement
    • Pattern of strengths and weaknesses
    • Response to intervention (RTI)

    Although a dyslexia diagnosis should not be based solely on the results of any single assessment, data from the TOD can be effectively used with any of the three IDEA models, subject to the requirements of individual states and school districts.

    Comparing vocabulary and/or reasoning composites to reading and spelling composites can provide evidence of discrepancy. For example, when vocabulary and reasoning scores are higher than reading and spelling scores, the difficulties in reading and spelling can be viewed as “unexpected” given verbal comprehension and reasoning abilities.

    TOD composites may also indicate a pattern of strengths and weaknesses that is common in individuals with dyslexia: difficulties in reading and spelling, paired with one or more significant linguistic weaknesses, and strong verbal comprehension and/or reasoning ability. TOD composites can be used to confirm such a pattern normatively or intra-individually.

    In school districts where students have received evidence-based instruction in a tiered setting, TOD-C standard scores based on national norms can confirm whether a student’s performance and progress are acceptable, or whether a diagnosis of SLD or another condition may be appropriate.

    The TOD Manual provides detailed guidance on identifying dyslexia probability using each of these models.

    Use in Progress Monitoring

    TOD standard scores and growth scores can be used to monitor progress over time. Standard scores are norm-referenced based on age or grade; therefore, achieving the same standard score after a year indicates that a student’s reading scores have increased at the same rate as those of other same-age or same-grade students. Growth scores show an individual’s progress compared to their own previous performance. Growth scores are sensitive to smaller changes, so an improvement of ten points or more indicates meaningful growth in a skill or ability. Used together, standard and growth scores can provide a clear picture of change.